导航:全球石油化工网 >> 产品频道 >> 炼油、化工设备 >> 过滤设备及配件 >> 压滤设备
该公司还有2条同类“压滤设备”供应商机
详细信息
 适用范围:   袋式  型号:   实际
 进料含水率:   化工 (%)  处理能力:   无纺布
 性能:   润滑油  品牌:   精密过滤
 滤室总容量:   实际 ((L))   

 SJ900Double Shaft Agitator    Operational Instruction       ZHANGJIAGANG CITY TONGHUI CHEMICAL CO。,LTD Ⅰ.Brief IntrouductionSJ900 double shaft agitator is new type high effectiveness stirring equiment,suitable to stir the materials with high viscosity.It is pioneer machine in china.There are high speed shaft and low speed shaft in the machine. Thestirring device in the low speed makes the material to overturn up and down in cylinder.the gear type vanes at high speed shaft bumps to and cuts the overturned materials in cylinder so as that the gathering body is broken quickly,mixed uniformly and solves quickly.The foreign and domestic advanced frequency changeable speed adjustment device is prepared for this machine.you can slect the best stirring rotation speed according to the material characteristic.Ⅱ.Main parameterHing speed motor:22KwLow speed motor:22Kw,matterd with BLD15-11-22reductorDispersing vane die:∮280 mmStirring device die:∮960 mmHigh speed shaft rotation speed:0~1,450 rpmLow speed shaft rotation speed:0~120 rpmMix.lifting stroke:1000mmNet volume of cylinder:550 literGear oil punp:CB-B  40liter/minOil punp motor:2.2 KwVacuum level: >-0.08 MpaInstallation control height: < 4,200mmTotal weight of main machine:∽3,000 KgOverall size( L╳W╳H ):2,580 ccum╳1,100╳3,100 mmVacuum pump:XD-040Ⅲ.Structureand performanceStructure: this machine consists of eight parts: hydraulic lifting, driven box,high & low stirring shafts,. Clamping device, stirring cylinder, hydraulic system, electic control box, frequency changeable speed adjustment device.Performance:⑴the vertical shaft lift and falls stably and flexiblity with an overflow protection device,which is safe and reliable with easy operation and good sealing.⑵In driven box, the low speed shaft is driven by reductor bringing up the main action wheel, which brings up the follower wheel through belt. The high speed shaft is linked with motor directly with smooth, stable and reliable drive and the compact structure.⑶Main driven sysstem runs stable and smooth with low noise, compiance with the environmental protection standard.⑷The gear pump is equipped for the hydraulic system with good driving performance in hydraulic  system.⑸The electric control box adopts the new products:CJ20 andCJ10 high quality electrical elements with compast structure, reasonable layout. The insulation resistance is not less than 2MΩ. The frequency changeable speed adjustment device is jointed with control box board as one body,All control buttons are fixed on pallet with easy operation and beautiful appearance.Ⅳ.Installation and commissioningInstallation⑴There should be pre-moded holes and embedded foot bolts 6-M20╳400(80mm higher than the ground level) for equipment foundation, refer to foundation size drawing for details.⑵The main machine installing vertical shaft should be vertical to the ground surface.⑶Oil tankinstallationThe oil tankof this machine has explosion protective function, which can locate at the explosion protective zone.(Ⅱ)Commissioning⒈Clean out the oil tank, pour into 32#machinery oil to the 2/3 of oil mark height of upper piastic.⒉Check the clamping mechanism and cylinder whether they are are clamped tightly.⒊Check whether the V-belt is tight properly.⒋Commissioning⑴Turn on power,press the lifting (pump motor) button, loose the air discharge valve screw,after drain away the air in cylinder, screw it tightly, adjust the overflow valve to the oil pressure 18Kgf/cm2(1.765Mpa).⑵Press the lifting button to make the cylinder to lift to mix. Stroke,then stop the machine and check the oil position of oil tank is not lower half of plastic oil mark height. Or,supplement the oil.Meanwhile, check whether alllinked part positions and sealing positions haveleakage. Press the falling button(Magnetic slide valve),make the cylinder body falling down to the lowest position.⑶After the stirring cylinder is alined to middle, adjust the adjustable screw in clamping device.Ⅴ.Use and maintenance(I)Use⑴turn on power, check whether all switches in control box, indicationg lamps button and voltage run well.⑵Clamp the stirring cylinder,make the clamping stroke closing, turn on the second power source, select the frequency conversion running or linefrequency running,press the button according to indicating plate. then, you can operate machine.⑶If the frequency conversion is required to run, please turn on the conversion power when the motor is under stopping conditions, adjust the cycle to the required frequency. Frequency605040302010Low speed(r/min)14412096724824 ⑷During operation, you should always pay attention to current. If the current is overloaded running, please stop machine to check cause, after drain out the fault, the machine can go on to run.⑸In normal operation or production or commissioning, you should thrust the material firstly, after the low speed vane is immerged into material, you can start the low speed shaft with low speed rotation .Meanwhile, add the same body of material slowly. After finish to add the material, you can adjust the speed to the high speed and start the high speed shaft and return button.⑹In normal operation , the material cylinder has 0.7 factor for material loading, i.e. The height of material loading is 490mm.⑺During operation, if the power is cut for too long time, the material temperature falls down to normal temperature and its viscosity is increased. Maybe, due to other cases such as solid content increasing, high viscosity,overload, the machine can,t start, you can lift the stirring vane over the liquid level, then start the low speed shaft with low speed, finally make the vertical shaft falling down slowly (by manual).when the dispersing vane immerges under liquid level, you can start high speed shaft. In thia time, the stirred material temperature rises and the viscosity falls down, it can reach the normal operation target. The operation time  can,t be too long, in case the solvent agent is volatilized.⑻After finsh working and stop to use, please cut down general switch Ⅲ, in case the machine is damaged.(Ⅱ)Maintenance⒈Normally add the lubricating oil to all driving parts. For high speed driven shaft, add MOS2-2(2# Lithium base lubricating grease)one time every week. For low speed drinen shaft, add ZL45-2(2# Lithium base lubricating grease), change the grease each half year.⒉For oil tank, adopt 32# machinery oil, change oil each half year and clean up the oil tank. Each month, clean up the filter screen. After change oil again, clean up one time within two or three days.⒊for the AC contactor, check one time each half year. After the equipment is used continuously for one year, make an overhaul.⒋If the equipment is not used for long time,you should cut off the power, clean up the whole manchine, pour all lubricating places. For main shaft and plunger, guide rod, please paint the oil to prevent from rust. Ⅵ.Rolling bearing list table NoBearing name SpecificationSizeQtyUsed place1Single row angular contact ball bearingD36215,GB292-64 60╳ 130 ╳ 312 High speed driven shaft2Single row angular contact ball bearing217,GB292-64 70╳ 150 ╳ 352Low speed driven shaft3Single row angular contact ball bearing309,GB292-64 45╳ 100 ╳ 25 1Driving belt wheel Spare parts list: NoNameSpecificationQtyMaterial1V-type  rubber sealing ring(A)200 x230 (B)HG4-33T-661-3-1assembled into one unitOil proof rubber 1-12O type sealing ringD240 x5.7 GB1235-762Oil proof rubber 1-13Oil seal felt ring200FJI145-79 1Oil proof rubber 1-14V-type  rubber beltD4500mm6Curtain cloth5Dispersing vane∮250mm11Cr18N9Ti6Assembled valveZHF-151 7Mechanical sealing152-60     212-701  
其它相关产品
相关搜索推荐
找不到合适信息?

留下您的采购意愿,我们将帮您推荐诚信供应商!
注:此功能仅对企业用户开放,如果您不是企业用户请点击注册.

免责说明
本网所展现的公司信息、产品信息及其他相关信息均由企业自行提供,信息的真实性、准确性和合法性由商铺所属企业完全负责。全球石油化工网对此不承担任何保证责任。
关于我们 | 会员服务 | 电子样本 | 邮件营销 | 网站地图 | 诚聘英才 | 意见反馈
Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工网 版权所有
京ICP证120803号 京ICP备05086866号-8 京公网安备110105018350