首页 资料分类 用户榜 | 积分说明    

  ·Field Trial Proves Upgrades


资料星级: 资料格式:pdf
上 传 者:Alex1989 下载次数:0
上传时间:2010-09-09 10:47:57

1分
721KB
推荐本资料到: 开心网 人人 豆瓣 新浪
收藏  举报  
  发送给好友

  详细介绍: 发表评论   
This work was conducted as a technology field trial at an
onshore location before trying it in the higher cost offshore
environment. Key steps were taken to reduce the risks of this
trial, including provisions to completely recover the
expandable equipment from the well in the event of a problem.
Also, risks unique to the relatively shallow depth of this
installation were addressed and minimized....
  该用户还有这些资料: 更多   

Operation of Two Ne...

THE KAPOK DEVELOPME...

New Directions in T...

Girassol: Drilling ...

Geohazards: Are We ...

Nansen/Boomvang Pro...

Ceiba Field Subsurf...

Prediction of P-Wav...


 
  其他相关资料: 更多   

通讯网关pFieldComm在钢厂能源...

工业通讯网关pFieldComm在机房...

Part II: Field oper...

Schlumberger Oilfie...

Schlumberger Oilfie...

Schlumberger Oilfie...

Schlumberger Oilfie...

Schlumberger Oilfie...

Schlumberger Oilfie...