导航:全球石油化工网 >> 资讯频道 >> 技术装备

哈里伯顿公司的新式海上油气工作船(英)

[加入收藏][字号: ] [时间:2009-02-05 Halliburton 关注度:0]
摘要:简介:哈里伯顿公司推出新型海上工作船Stim Star Borneo,它是为在东南亚进行作业而设计的。它能进行各项增产措施,并能使用连续管进行修井作业。 Operators in Southeast Asia can now mo...
简介:哈里伯顿公司推出新型海上工作船Stim Star Borneo,它是为在东南亚进行作业而设计的。它能进行各项增产措施,并能使用连续管进行修井作业。

Operators in Southeast Asia can now more readily implement Halliburton advanced stimulation and well intervention technologies. The new Stim Star Borneo vessel is a self propelled barge designed to work in the offshore oil and gas fields with the additional capability of servicing
wells in the rivers and deltas in Indonesia. 

The vessel is fully equipped to handle all phases of production stimulation including acidizing, acid fracturing, proppant fracturing, sand control and conformance treatments. In addition, the vessel is equipped to provide well intervention services using coiled tubing. 

Slickline and electric line capabilities can be readily added when required. 

At 200 ft length and 66 ft width, the Stim Star Borneo has an operating draft of 10.5 ft offshore and 9 ft in the delta areas. 

Above deck storage capacities consist of 5,200 gal acid, almost 4,400 gal additives and 350,000 lb proppant. 

Below deck capacities are almost 3,500 bbl of process and completion fluid and over 4,700 bbl of drill water. 

Maximum fracturing rate is 18 bbl/min with sand and 25 bbl/min with clean fluid.

Focused on Safety and Environmental Performance 

The Stim Star Borneo meets or exceeds the requirement of SOLAS and other regulatory bodies. In addition, the vessel is outfitted to provide environmentally sustainable operations. 

Advanced Technologies for Improved Well Performance 

The Stim Star Borneo serves as a platform that enables Halliburton specialists to reliably deliver key services. 

Reservoir Deliverability Solutions 

• Hydraulic fracturing
• Tight gas reservoir technologies
• Horizontal well fracturing
• Limited entry to bypass damage
• Near-wellbore damage removal
• Matrix acidizing
• Foamed acid
• Near-wellbore damage removal (cont’d)
• Scale removal (mechanical and chemical)
• Waterblock removal
• Horizontal well cleanup 

Conformance Solutions 

• Chemical water shut off
• Relative permeability modification 

Sand Control Solutions 

• New completions
• Fracpack
• High rate water pack
• Thru-tubing intervention
• Resin sand consolidation
• Thru-tubing gravel pack with coiled tubing 

Well Intervention Solutions – Coiled Tubing 

• Nitrogen services
• Fishing and milling
• Stimulation
• Sediment washing
• Logging 

InstaVis™ Mixing System 

The Stim Star Borneo is equipped with Halliburton’s proprietary InstaVis™ gel-on-the-fly system that uses a fully hydrated fracturing gel concentrate and provides important advantages: 

• Eliminates waiting for gel hydration.
• Enables almost instantaneous adjustments to help match fluid characteristics to formation parameters.
• Requires no waiting time to build additional fluid volume or change viscosity.
• Enables optimization of gel polymer loading during the treatment which can reduce the amount of polymer in the formation.

关键字: 修井船 哈里伯顿 
关于我们 | 会员服务 | 电子样本 | 邮件营销 | 网站地图 | 诚聘英才 | 意见反馈
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工网 版权所有 京ICP证080561号