Comparisons between pre-seismic and post-seismic geological interpretations were studied, a thorough volumetric analysis was
with a subsequent material balance calculations and a reservoir computer simulation was Once a history match was made, prediction studies were for both remaining "primary" reserves and for
secondare reserves recoverable through a new water-flood design and implementation.