This work was conducted as a technology field trial at an
onshore location before trying it in the higher cost offshore
environment. Key steps were taken to reduce the risks of this
trial, including provisions to completely recover the
expandable equipment from the well in the event of a problem.
Also, risks unique to the relatively shallow depth of this
installation were addressed and minimized.