wells were required for field development. Five were predrilled
to total depth before the TLP was installed at the site.
These wells are referred to as “pre-drilled” wells, and they will
be completed and produced through 10-¾” production risers.
The remaining three wells, referred to as “batch-set” wells,
were pre-drilled to an intermediate depth, and their 13-5/8”
casing strings were set. Final drilling for these three wells will
be performed by the TLP rig.