首页 资料分类 用户榜 | 积分说明    

  ·The First Offshore Field Installation for a Composit


资料星级: 资料格式:pdf
上 传 者:Alex1989 下载次数:1
上传时间:2010-09-01 21:08:20

5分
448KB
推荐本资料到: 开心网 人人 豆瓣 新浪
收藏  举报  
  发送给好友

  详细介绍: 发表评论   
The first offshore demonstration of composite risers was
successfully conducted on the Heidrun TLP in the Norwegian
North Sea during the period from July 2001 to January 2002.
The field demonstration involved the installation of a full size
high-pressure composite drilling riser joint, and using it to
drill three wells while located at different positions along the
riser string. 
  该用户还有这些资料: 更多   

Field Trial Proves ...

Operation of Two Ne...

THE KAPOK DEVELOPME...

New Directions in T...

Girassol: Drilling ...

Geohazards: Are We ...

Nansen/Boomvang Pro...

Ceiba Field Subsurf...

Prediction of P-Wav...


 
  其他相关资料: 更多   

通讯网关pFieldComm在钢厂能源...

工业通讯网关pFieldComm在机房...

offshore industry

Offshore 2011年3月

Offshore 2011年2月

Offshore 2011年1月

Part II: Field oper...

Schlumberger Oilfie...

Schlumberger Oilfie...